Architecture / Town Planning / Interior Design / Project Management

About

Renovation and extension of a 1970s bungalow in the heart of the Chichester Harbour Area of Outstanding Natural Beauty. This waterfront property occupies a particularly sensitive location and required a sensitive design approach to secure Planning Permission. The design maximised the properties wide water frontage and included large areas of glazing. HDS undertook the role of full contract administration for this project.

Size

280m²

Location

Birdham, Chichester

Year

2023

Duration

15 Months

RIBA Stage

RIBA Stage 5

Birdham, Chichester

Birdham, Chichester

Size

280m²

Location

Birdham, Chichester

Year

2023

RIBA Stage

RIBA Stage 5

Duration

15 Months